Electrical for remodels

VoltGen Energy handles the electrical for kitchen, bath, addition and ADU remodels in Burbank, Glendale, Pasadena, Studio City and the San Fernando Valley. A remodel is the best chance a house gets to fix its wiring. We plan circuits, lighting and panel capacity with the rest of the remodel, rough it in while the walls are open, and get it inspected before they close.

What remodel electrical covers

  • Kitchens. Dedicated circuits for appliances, 240-volt circuits for induction ranges and ovens, counter outlets with ground-fault protection, under-cabinet and ceiling lighting.
  • Bathrooms. Ground-fault protected outlets, exhaust fans, heated floors, lighting and mirror circuits.
  • Whole-house remodels. Rewiring old circuits while walls are open, relocating or replacing the panel, and adding a subpanel where the layout calls for one.
  • Electrification. Circuits for heat pumps, heat-pump water heaters, induction ranges, electric dryers and EV chargers, checked against the load calculation.

Sequencing

  1. Load calculation and circuit plan before demolition, so the permit and panel decision are made early.
  2. Rough-in once framing is done, then the rough inspection.
  3. Insulation and drywall only after the rough inspection passes.
  4. Devices, fixtures and final inspection at the end.

VoltGen Energy operates alongside Akopi Builders, so the electrical schedule is built into the remodel schedule instead of fitted around it.

VoltGen Energy operates under Akopi Builders, CSLB #1112420. Electrical work is performed by licensed C-10 electrical contractors. Check the license at CSLB.

Older house? See old-home rewiring. Adding a sauna or spa? See sauna and spa electrical. What it costs and what code asks for: kitchen and bathroom remodel electrical in Los Angeles Building an ADU or an addition? See ADU and addition electrical: panel, subpanel, separate meter and cost.

Questions we get

When should the electrical be planned in a remodel?

Before demolition. The lighting plan, appliance circuits and any panel change affect framing, cabinet layout and the permit, so they belong in the plan from the start rather than after the walls are open.

Do you work with other general contractors?

Yes. We work on remodels run by Akopi Builders and by other contractors or owners, as long as the schedule gives the electrical rough-in and inspection their place before insulation and drywall.

Is a remodel a good time to rewire the rest of the house?

Often, yes. With walls and ceilings open, new wire can be run with far less effort than fishing it later. We will tell you which circuits are worth replacing while you have the access.

Do I have to bring the whole house up to code when I remodel?

Generally no. New and altered work has to meet the current code; wiring elsewhere in the house can usually stay unless it is unsafe or the new work depends on it, such as a circuit you extend, which may then need arc-fault protection. One California rule catches many owners: when a permit is issued for work valued over $1,000, the house must have smoke alarms where current code requires them, and carbon monoxide alarms if it has an attached garage or gas appliances. Your inspector, at LADBS or your city, has the final say.

Should I use my own electrician or my contractor's?

Either can work. What matters is that one party owns the electrical plan and its place in the schedule: the load calculation, the panel decision, rough-in before insulation and drywall, and the inspections. If your general contractor brings an electrician, ask who pulls the electrical permit and who answers for the load calculation. VoltGen Energy works on remodels run by Akopi Builders and by other contractors or owners.

Planning a remodel?

Call before demolition. It is much easier to get the electrical right when it is planned with the layout.